摘 要:介紹了AP1000核電廠的電氣系統(tǒng)及中壓廠用電源切換的設計特點,對核電、常規(guī)火電的廠用電切換設計進行了差異比較,分析了AP1000核電在非正常運行方式下的中壓廠用電源切換特點及設計優(yōu)化過程。通過設計優(yōu)化,取消了輔助鍋爐運行閉鎖廠用電快切,并提出了相關建議,為后續(xù)AP1000工程提供參考。
關鍵詞:核電廠;中壓廠用電源;切換設計
中圖分類號:TM623 文獻標識碼:B 文章編號:1007-3175(2019)06-0028-06
Design & Optimization of Medium Voltage Buses Transfer in AP1000 Nuclear Power Plant
YAO Tie-bing1, ZHANG Hui-guo2, XIA Xiao-lei1
(1 Shandong Nuclear Power Company Ltd, Yantai 26511 6, China;
2 Yuncheng Power Supply Company of State Grid Shanxi Electric Power Company, Yuncheng 044000, China)
Abstract: Introduction was made to the design characteristic of the electrical system and medium voltage buses transfer of AP1000 nuclear power plant. This paper compared the difference of medium voltage buses transfer between nuclear power plant and normal thermal power plant and analyzed the medium voltage buses transfer characteristic and design optimization procedure of AP1000 nuclear power under abnormal operation mode. Via design optimization, the buses transfer wasn’t be blocked any longer when auxiliary boilers were in operation. This paper gave the relevant suggestion, which provides references for the follow-up AP1000 project.
Key words: nuclear power plant; medium voltage buses transfer; switch design
參考文獻
[1] 王林暉, 苗偉東, 李忠全. 首批A P1000機組廠用電切換設計分析及改進建議[J]. 機電信息,2014(30):131-135.
[2] 電力行業(yè)繼電保護標準化技術委員會. 電廠廠用電源快速切換裝置通用技術條件:DL/T 1073—2007[S]. 北京:中國電力出版社,2008:5-8.
[3] 王新. 火電機組工作與備用電源為兩電網(wǎng)的廠用電切換[J]. 科技情報開發(fā)與經(jīng)濟,2011,21(28):181-184.
[4] 公方濤. 淺談SID-8BT-A備用電源快速切換裝置原理及應用技術[J]. 科技創(chuàng)新導報,2013(15):253-254.
[5] 任少義. AP1000核電廠孤島運行廠用電源同期切換研究[J]. 電氣技術,2017(9):57-60.