智能變電站備自投裝置誤動分析及改進措施
吳勇海
(國網(wǎng)福建省電力有限公司龍巖供電公司,福建 龍巖 364000)
摘 要:分析了一座110 kV智能變電站在母線電壓互感器PT 及一條110 kV線路轉(zhuǎn)檢修過程中,110 kV備自投裝置動作后,未合上備用線路開關,造成全站短時失壓的事故。通過對現(xiàn)場備自投裝置動作報文、開入量SOE變位及監(jiān)控后臺報文分析,并查閱該110 kV備自投裝置說明書,得到備自投裝置在聯(lián)切線路轉(zhuǎn)檢修時邏輯存在問題——聯(lián)切線路的跳位取的是操作箱的TWJ,斷開操作電源時TWJ 復歸。根據(jù)影響110 kV備自投正確動作的不同原因提出:一是增加聯(lián)切線路檢修時對應的線路相對應的檢修開入壓板;二是110 kV進線備自投的兩條互備線路及母線PT,三者其中之一轉(zhuǎn)檢修,也同時將備自投裝置退出,以防備自投裝置誤動。
關鍵詞:智能變電站;備自投裝置;誤動;改進措施
中圖分類號:TM63 文獻標識碼:B 文章編號:1007-3175(2020)11-0049-04
Analysis and Improvement Measures of an Incorrect Operation of the Reserve
Power Source Automatic Connection Devices in Smart Substation
WU Yong-hai
(Longyan Power Supply Company, State Grid Fujian Electric Power Company, Longyan 364000, China)
Abstract: In this paper, analysis an 110 kV smart substation in the bus voltage transformer PT and an 110 kV line in the process of overhaul, after the 110 kV reserve power source automatic connection devices(RPSACDs)is activated, the backup line switch is not closed, causing a short-term voltage loss of the whole station.By analyzing the operation messages of the on-site RPSACDs, the position of the input SOE and monitoring the background message, and consulting the 110 kV RPSACDs manual, it is found that the RPSACDs has logic problems when the combined switching line is transferred for maintenance— —The jump position of the combined circuit is the TWJ of the operation box, and the TWJ will reset when the operating power is disconnected.According to the different reasons that affect the correct operation of 110 kV standby automatic switching, the following is proposed: First, increase the maintenance opening of the corresponding line during the maintenance of the combined line; the second is the two mutual backup lines and busbar PT of 110 kV incoming line and automatic switching.One of the three is transferred to overhaul, and the automatic RPSACDs is also withdrawn to prevent the RPSACDs from malfunctioning.
Key words: smart substation; reserve power source automatic connection devices; incorrect operation; improvement measures
參考文獻
[1] 林桂輝,甘德樹,吳海雄,等. 考慮備自投動作的電網(wǎng)運行事故等級預判方法研究及系統(tǒng)開發(fā)[J]. 電氣自動化,2018,40(3):78-80.
[2] 毛宇晗,張焰,蘇運. 多電壓等級配電網(wǎng)備用電源自動投切裝置的優(yōu)化配置方法[J]. 電力自動化設備,2018,38(6):72-78.
[3] 馬力,宋庭會,庫永恒. 防止母線PT斷線引起備自投不正確動作的研究與改進[J]. 繼電器,2008,36(2):79-81.
[4] 張健. 不完全擴大內(nèi)橋接線下智能站備自投方案探討[J]. 安徽電氣工程職業(yè)技術學院學報,2019,24(3):74-77.
[5] 孫立新,孫華. 一次備自投裝置誤動的思考[J].電力系統(tǒng)保護與控制,2009,37(21):134-137.
[6] 曹偉杰,王譽嬌,陶天祎,等. 智能站備自投裝置誤動分析[J]. 電氣技術,2019(5):90-91.
[7] 鄒德虎,徐希,閃鑫. 基于集中校核與分散控制的備自投系統(tǒng)[J]. 電力系統(tǒng)保護與控制,2017,45(21):140-146.
[8] 仲雅霓,姚成,郄朝輝,等. 智能變電站基于站控層GOOSE輸入輸出的備自投裝置研制[J]. 電氣自動化,2016,38(1):62-64.
[9] 楊忠禮,趙慧光,張光衡. 影響備自投正確動作原因分析[J]. 電力系統(tǒng)保護與控制,2008,36(21):97-99.