3/2接線電流互感器安裝位置和方向?qū)ΡWo(hù)的影響
羅虎,羅旭,郭夏
國(guó)網(wǎng)河南省電力公司檢修公司,河南 南陽(yáng) 473000
摘 要:介紹了500 kV 主接線的特點(diǎn),結(jié)合現(xiàn)場(chǎng)案例,分析了500 kV 變電站3/2 接線電流互感器安裝位置和方向不同對(duì)保護(hù)的影響,指出在設(shè)計(jì)時(shí)要根據(jù)使用特點(diǎn),合理地選擇電流互感器的安裝位置、P1 的方向、二次繞組的套裝位置,保證系統(tǒng)穩(wěn)定運(yùn)行。
關(guān)鍵詞:電流互感器;3/2 接線;安裝位置
中圖分類號(hào):TM452;TM645 文獻(xiàn)標(biāo)識(shí)碼:B 文章編號(hào):1007-3175(2013)10-0044-03
Impact of 3/2 Wiring Current Transformer Installation Position and Direction on Protection
LUO Hu, LUO Xu, GUO Xia
Henan Electric Power Company Maintenance Company of State Grid, Nanyang 473000, China
Abstract: Introduction was made to characteristics of 500 kV main wiring. Combined with onsite cases,this paper analyzed the impacts of 500 kV substation 3/2 wiring current transformer installation position and direction difference on protection. It was pointed out that in design the installation position of current transformer should be reasonably selected according to its use features, as well as the direction of P1 and suit position of secondary winding so as to assure stable operation of the system.
Key words: current transformer; 3/2 wiring; installation position