110 kV擴大內橋接線的備自投策略優(yōu)化研究

來源:電工電氣發(fā)布時間:2016-12-19 08:19 瀏覽次數:8
110 kV擴大內橋接線的備自投策略優(yōu)化研究
 
安振華,金震,余群兵,董凱達,馮寶成
(南京南瑞繼保電氣有限公司,江蘇 南京 211102)
 
    摘 要:針對一次接線為擴大內橋形式的變電站在分期建設過程中,前期斷路器配置不完整的情況,提出了基于原有備自投方式的適應性強的改進方法。設置了允許有主變停運的特殊方式,保證在特殊情形下的供電可靠性,并針對小電源接入后對備自投啟動條件的影響,提出了頻率變化啟動和位置不對應啟動的快速啟動策略,加速了備自投的動作過程,提升了快速恢復供電的能力。
    關鍵詞:擴大內橋接線;運行方式;適應性;快速啟動策略
    中圖分類號:TM762.1     文獻標識碼:A     文章編號:1007-3175(2016)12-0036-04
 
Research on Strategy Optimization of Spare Power Automatic
Switching for 110 kV Expanded Inner-Bridging Line
 
AN Zhen-hua, JIN Zhen, YU Qun-bing, DONG Kai-da, FENG Bao-cheng
(Nari-Relays Electric Co.,Ltd, Nanjing 2111 02, China)
 
    Abstract: Aiming at the situation that the earlier stage circuit breakers were configured incompletely in stage construction process of transformer
substations with expanded inner-bridging line as primary connection, this paper proposed the adaptable improved method based on the
original spare power automatic switching mode. The special mode was set to allow the main transformer outage to ensure the power distribution
reliability under special conditions. In allusion to impacts of small power source connection on the starting condition of spare power automatic
switching, this paper raised the quick start strategy of frequency change starting and location non-correspondence starting, which speeds up the
action process of spare power automatic switching and promotes the capacity of quick power recovery.
    Key words: expanded inner-bridging line; operation mode; adaptivity; quick starting strategy
 
參考文獻
[1] 王珂,姚建國,姚良忠,等. 電力柔性負荷調度研究綜述[J]. 電力系統自動化,2014,38(20):127-135.
[2] 徐小寧. 變電站主接線方式可靠性評估與方案優(yōu)選[J]. 電工技術學報,2015,30(12):441-446.
[3] 許巍,王慧芳,杜振東,等. 輸電線路最佳經濟壽命區(qū)間評估[J]. 電力系統自動化,2015,39(12):74-80.
[4] 于弘洋,周飛,荊平,等. 城市電網緊湊化輸電增容技術探討[J]. 智能電網,2014,2(8):26-30.
[5] 文屹,董凱達,劉孝旭,等. 多層次一體化備自投系統的研究及應用[J]. 電力系統保護與控制,2015,43(23):104-110.
[6] 蘇宜強,孔璐,伏祥運,等. 單母線分段接線中備用電源自動投入裝置的改進[J]. 電力系統自動化,2012,36(22):120-122.
[7] 張明清. 海安110 kV李堡變電站數字化改造[J].現代電力,2012,29(1):33-36.
[8] 黃國日,文福拴,劉昌,等. 確定變壓器更換策略的機會成本方法[J]. 電力建設,2016,37(4):35-42.
[9] 孟明,蔣旻奕,趙樹軍,等. 基于綜合支出費用法的配電變壓器經濟容量研究[J]. 電力科學與工程,2016,32(6):26-31.
[10] 胡衛(wèi)東,胡初四,黃巖,等. 小電源接入配電網對自動裝置的影響及對策[J]. 電力科學與技術學報,2009,24(4):93-97.