Suzhou Electric Appliance Research Institute
期刊號(hào): CN32-1800/TM| ISSN1007-3175

Article retrieval

文章檢索

首頁(yè) >> 文章檢索 >> 往年索引

變電站10 kV系統(tǒng)接地方式技術(shù)改造

來(lái)源:電工電氣發(fā)布時(shí)間:2017-09-21 13:21 瀏覽次數(shù):10
變電站10 kV系統(tǒng)接地方式技術(shù)改造
 
謝明磊
(廣東電網(wǎng)有限責(zé)任公司梅州供電局,廣東 梅州 514021)
 
    摘 要:為兼顧供電可靠性和人身設(shè)備安全,保證發(fā)生單相瞬時(shí)故障時(shí)能促進(jìn)弧光自熄,且當(dāng)發(fā)生永久性接地故障則發(fā)出跳閘信號(hào)切除故障線路,將110 kV丙村變電站10 kV不接地系統(tǒng)改造成故障相經(jīng)電抗器接地系統(tǒng),闡述了故障相經(jīng)小電抗接地方式的工作原理,并給出了具體技術(shù)改造方案和注意事項(xiàng),現(xiàn)場(chǎng)調(diào)試結(jié)果表明,該站技術(shù)改造達(dá)到了預(yù)期目的。
    關(guān)鍵詞:不接地系統(tǒng);故障相經(jīng)電抗器接地;技術(shù)改造
    中圖分類號(hào):TM645     文獻(xiàn)標(biāo)識(shí)碼:B      文章編號(hào):1007-3175(2017)09-0041-03
 
Technical Transformation of 10kV Power System Grounding Method for Substations
 
XIE Ming-lei
(Meizhou Power Supply Bureau, Guangdong Power Grid Corporation, Meizhou 514021, China)
 
    Abstract: In order to balance power supply reliability and the safety of personnel and equipment, to guarantee the arc light self-extinguishing when the single-phase transient fault occurs, and to send a trip signal to cut off the fault line when a permanent grounding fault occurs, the 10 kV isolated neutral system of 110 kV Bing village substation was reformed to become the reactor grounding system through faulty phase. This paper expounded the working principle of reactor grounding through faulty phase mode and gave the concrete technical transformation plan and matters need attention. The field debugging result shows that this technical transformation reaches the expected goal.
    Key words: isolated neutral system; reactor grounding through faulty phase; technical transformation
 
參考文獻(xiàn)
[1] GB/T 50064—2014 交流電氣裝置的過(guò)電壓保護(hù)和絕緣配合設(shè)計(jì)規(guī)范[S].
[2] 干耀生,唐慶華,方瓊,張黎明,付艷華,房亞囡.城市中壓配網(wǎng)中性點(diǎn)小電阻接地方式分析[J].電力系統(tǒng)及其自動(dòng)化學(xué)報(bào),2013,25(3):138-141.
[3] 李明,王斌.配電網(wǎng)中性點(diǎn)電阻接地方式和消弧線圈接地方式比較[J].天津電力技術(shù),2011(1):24-25.
[4] 麥洪,岳龍,金向朝,李莉,張博,魯鐵成.配電網(wǎng)小電抗接地方式的分析[J].武漢大學(xué)學(xué)報(bào)(工學(xué)版),2014,47(5):648-653.